Gosford Hospital – Mental Health Unit


Quick Facts:

CLIENT: Blue Visions Management
ARCHITECT: Suters Architects
PROJECT VALUE: $9.2M
AWARD: MBA Excellence in Construction Award for Health Buildings up to $10M

  • Design, development and construction of 30-bed Mental Health Unit.
  • Complex façade engineering.
  • Staged construction methodology within complex operational environment.
  • Ongoing collaboration with multiple design updates.

 

Project Details:

As required by the client, this 30-bed project required considerable user group coordination so that project stakeholders could collaborate on design and outcomes. This in-depth process involved more than 100 stakeholders, and resulted in investigating and pricing over 270 potential changes.

Throughout the project, Lahey was proactive in seeking clarification of potential design changes on a weekly basis. As different contractors were engaged throughout each stage, considerable updates to project documentation were required. Lahey coordinated this process to ensure the accuracy and consistency of project documentation from end-to-end.